Product Details
waste management equipmentintegrated sewage treatment equipment.
1.Compact structure,small land occupation.
2.One unit with full components,efficient operation.
3.Combine the nucleus and assistant treatment,with stable water quality.
4.Apply qravity flow,saving power.
5.Simple operation,no professional management.6. may be buried below the surface, the upper landscaping equipment, lawn, can also be set up indoors.
7, no effect on the surrounding environment, sludge produced less noise than the standard Type II areas.
8, automatic control, without professional management.
9, simple, easy maintenance, process a new, effective, long service life.
10, according to the standard layout of equipment, but also requires special arrangements with the terrain.integrated sewage treatment equipment Composed of seven parts:
* primary sedimentation tank;
* anoxic;
*contact oxidation;
*secondary settling tank;
*pool disinfection, sterilization equipment;
*sludge pond;
*room air composition.
* primary sedimentation tank: the primary sedimentation tank to vertical flow sedimentation tank, the sewage in sedimentation tank of the increased flow rate of 0.3 ~ 0.4 mm / s, the sludge settling down to upgrade to the sludge tank.